您当前的位置:
首页 >
文章列表页 >
Analysis of New Nuclear Power Plant License Application Management
更新时间:2026-01-19
    • Analysis of New Nuclear Power Plant License Application Management

    • Issue 1, Pages: 12-14+21(2017)
    • DOI:10.16056/j.1005-7676.2017.01.004    

      CLC: TU71;TM623
    • Published:2017

    移动端阅览

  • 李俊, 冯成, 陈田. Analysis of New Nuclear Power Plant License Application Management[J]. 2017, (1): 12-14+21. DOI: 10.16056/j.1005-7676.2017.01.004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

59

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Quality Management Practice and Exploration of Pengze Photovoltaic Power Project
Quality Management Key Points Analysis and Exploration of Nuclear Power Plant Prophase
Safety Culture Cultivation Practice and Exploration of Nuclear Power Plant Prophase
The Application of Domestic Manufactured Control System Platform on CAP1400 Nuclear Power Plant Prototype
Prediction of I-129 and Cs-137 in the Spent Fuel of China’s Nuclear Power Station

Related Author

葛仲奕
李俊
李俊
陈田
邓军
李俊
赵思彧
钮云龙

Related Institution

上海交通大学自动化系
核技术应用教育部工程研究中心(东华理工大学)
东华理工大学核工程与地球物理学院
东华理工大学核技术应用教育部工程研究中心
东华理工大学核工程地球物理学院
0