王丰. Evaluation of General Plot Plan Scheme in Fired Power Plants based on AHP-Entropy Weight Fuzzy Assignment Combined Model[J]. 2016, (4): 31-33+38. DOI: 10.16056/j.1005-7676.2016.04.008.
Evaluation of General Plot Plan Scheme in Fired Power Plants based on AHP-Entropy Weight Fuzzy Assignment Combined Model
摘要
在介绍AHP-熵权综合模型的基础上
以某集团固镇经济开发区2×15 MW供热电站工程为研究对象构建评价指标体系
并利用该评价体系对电厂总图运输设计方案进行评价
从而得出了总图方案各要素的优劣排序及需要改进的指标
最终为总平面布置优化提供了依据。
Abstract
On the basis of the AHP-entropy weight fuzzy assignment combined model was introduced
as a research object of the 2×15 MW fired power plants in economic development zone in Guzhen. Then evaluation indicator system wasestablished.Application of the model to evaluate the scheme of the fired power plants generallayout
it is sort the scheme and get the index which need to improve
finally provides a basis for general layout optimization.