某新建百万机组电厂在调试过程中
循环水系统、闭式水系统、给水系统、凝结水系统、EH油系统、润滑油系统、真空系统、辅助蒸汽系统以及振动出现一些问题
对问题逐一解决
保证机组顺利投产
对解决同一类型机组调试中遇到的问题
以及运行中遇到的问题有一定的借鉴。
During the 1 000 MW turbine plant construction
circilating water system
close cooling water sysytem
feed water system
condensate water system
EH oil system
vacuum system
auxiliary system
vibration was analyzed. Turbine proper and auxiliary system was solved one by one
and the unit was put into operation at last.