As critical infrastructure for flood control and food security
large-and medium-sized irrigation and drainage pumping stations are central to advancing high-quality water conservancy development in the new era. Standardizing the construction and management of these stations has become an essential strategy for improving overall performance and sustainability. This paper investigates the current status of such pumping stations in Guangdong Province
identifies key challenges in the standardization process
and analyzes their root causes. In response
this paper proposes a series of targeted measures
including upgrading outdated equipment
enhancing the safety and operational standards of pumping stations
improving and standardizing management systems
beautifying the station premises and surrounding environment
improving the professional competence of station management personnel
optimizing station signage and identification systems
standardizing all operational and maintenance record-keeping
strengthening inspection routines and regular maintenance
ensuring sufficient funding for operation and maintenance
advancing the digitalization of station management
enhancing training efforts for standardized station development
and promoting phased implementation of standardization initiatives. These strategies are intended to serve as practical references for advancing the standardized construction and management of pumping stations nationwide.