In order to resist the extremely severe flood in the Haihe River Basin in July 2023
eight national flood storage and detention areas were successively activated
effectively reducing the flood control pressure in the downstream areas. However
this also caused certain economic losses in the flood storage and detention areas and affected the production and living order of the residents. The Party and the country attach great importance to post-disaster reconstruction work and carry out compensation work for the use of flood storage and detention areas in accordance with procedures. By investigating the compensation situation for the operation of flood storage and detention areas
the progress of post-isaster reconstruction work
and the restoration of the production and living order of the masses
this article summarizes the experience
practices
existing problems and difficulties in the compensation work for the operation of flood storage and detention areas in the Haihe River Basin. It puts forward suggestions such as improving relevant laws and regulations for the management and compensation of flood storage and detention areas
standardizing the work process of compensation for the operation of flood storage and detention areas
strengthening training and publicity for compensation for the operation of flood storage and detention areas
promoting flood insurance in flood storage and detention areas in an orderly manner
and establishing normalized compensation for flood storage and detention areas. These suggestions are aimed at further optimizing the compensation work for the operation of flood storage and detention areas in the Haihe River Basin and helping residents quickly rebuild their production and living order.