there are significant differences in the implementation of integrated urban and rural water supply projects between mountainous areas and plain areas. This article analyzes the key and difficult points of integrated urban and rural water supply construction in mountainous areas in terms of terrain differences
water plant site selection
water pipeline design
and project operation management. Taking Jing County
Xuancheng City
Anhui Province as a case study
it analyzes the issues from the perspective of water intake head construction
diversion tunnel design
and water hammer protection
to ensure the safe operation of long-distance water transmission projects