Liu Hongda. Analysis of an Oil-leakage and Heating Defect in a 110 kV Bushing-type Cable Terminal[J]. Rural Electrification, 2026, (9): 47-53.DOI: 10.13882/j.cnki.ncdqh.2605F012.
Analysis of an Oil-leakage and Heating Defect in a 110 kV Bushing-type Cable Terminal
Taking an oil-leakage and heating defect in a 110 kV bushing-type cable terminal as the research object
combining it with live detection technology
this study eliminates the possibility that the defect is caused by the material itself through disassembly inspection and stress cone material detection. Based on the terminal structure and the mechanisms of oil-leakage and heating
the causes of the oil-leakage and heating defect are systematically analyzed. The study reveals that the root cause of the defect is poor lead sealing workmanship
which leads to moisture ingress into the cable. During long-term operation
partial discharge is generated
resulting in ablation and cracks on the stress cone
and ultimately causing the oil-leakage and heating of the terminal. In view of this problem
preventive measures are put forward
including strengthening the full-life cycle management of equipment and deepening the application of live detection and online monitoring technologies
which provide an important technical reference for the construction quality control and operation management of high-voltage cables.
Chen S,Xia Y,Shao X,et.al.Cause Analysis and Countermeasure of Oil Leakage Caused by Cable Terminal Belt Expansion[C],2019 IEEE 3rd Conference on Energy Internet and Energy System Integration (EI2),Changsha,China,2019: 2338-2341.
Liu Z. W.,Li J. L.,Zhang T. Y.,et al.Accurate identification of partial discharge signals in cable terminations of high-speed electric multiple unit using wavelet transform and deep belief network[J].Applied Sciences,2024,14(11):4743.