Research on Installation, Debugging and Construction Technology of Relay Protection Equipment in 110 kV Substation
Operation & Maintenance | 更新时间:2026-01-07
    • Research on Installation, Debugging and Construction Technology of Relay Protection Equipment in 110 kV Substation

    • “In the field of installation and commissioning of substation relay protection equipment, experts have designed an automated commissioning plan to ensure that the equipment installation position deviation is within the allowable range, achieve electrical insulation, and ensure that the insulation resistance meets the design value standard.”
    • Rural Electrification   Issue 12, Pages: 66-69(2025)
    • DOI:10.13882/j.cnki.ncdqh.2511A021    

      CLC: [TM755;32400.14.ncdqh.2511A021
    • Received:06 November 2025,

      Published:10 December 2025

    移动端阅览

  • Jian ZHOU. Research on Installation, Debugging and Construction Technology of Relay Protection Equipment in 110 kV Substation[J]. Rural Electrification, 2025, (12): 66-69. DOI: 10.13882/j.cnki.ncdqh.2511A021.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Based on the Relay to Simplify the Distribution Network Automation Secondary Transformation Method
Talking About the Reasons for the Long Operation Time of 110 kV Substation
Technical Scheme and Precautions for Maintenance and Replacement of Switch in Substation

Related Author

Huihuang XU
Chao WANG
Ling XU
Cunbin LYU
Yapeng CUI
Dexiang XU

Related Institution

Chun'an Electric Power Industry Co., Ltd., Zhejiang Chun'an
State Grid Zhejiang Chun'an County Power Supply Company, Zhejiang Chun'an
Zhejiang Huayun Information Technology Co., Ltd.
State Grid Shaanxi Yulin Power Supply Company
Guangdong Xianda Electric Co., Ltd
0