Research and Application of Load Transfer Strategy Without Outage in 35 kV Substation
Power Grid|更新时间:2026-01-07
|
Research and Application of Load Transfer Strategy Without Outage in 35 kV Substation
“In the field of county-level power supply, during the renovation and construction of 35kV substations, zero user perception and zero load loss were achieved through the use of line interconnection switches and the "live+power generation" transfer method.”
Ye YUAN, Naiqiang MAO, Jian GAO. Research and Application of Load Transfer Strategy Without Outage in 35 kV Substation[J]. Rural Electrification, 2025, (12): 28-32.
DOI:
Ye YUAN, Naiqiang MAO, Jian GAO. Research and Application of Load Transfer Strategy Without Outage in 35 kV Substation[J]. Rural Electrification, 2025, (12): 28-32. DOI: 10.13882/j.cnki.ncdqh.2504A027.
Research and Application of Load Transfer Strategy Without Outage in 35 kV Substation