Application of Crossing Frames and Protective Netting in Practical Engineering
Power Grid|更新时间:2025-10-13
|
Application of Crossing Frames and Protective Netting in Practical Engineering
“In the Shunyi Renewable 220kV Transmission Project, experts have summarized the construction plan for uninterrupted power crossing, optimized the sealing structure, and applied BIM technology to provide valuable experience for similar projects.”