Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations
Beijing Topic|更新时间:2025-11-14
|
Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations
“In the context of tight urban land resources, the small-scale renovation of a 220kV substation in Beijing effectively solved problems such as soil settlement, concrete cracks, and leakage through finite element simulation and geogrid reinforcement techniques, providing technical reference for civil construction in the power industry.”
Ge GAO, Demin WANG, Hanxiong GAO, et al. Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations[J]. Rural Electrification, 2025, (5): 14-17, 72.
DOI:
Ge GAO, Demin WANG, Hanxiong GAO, et al. Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations[J]. Rural Electrification, 2025, (5): 14-17, 72. DOI: 10.13882/j.cnki.ncdqh.2503A067.
Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations