您当前的位置:
首页 >
文章列表页 >
Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations
Beijing Topic | 更新时间:2025-11-14
    • Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations

    • “In the context of tight urban land resources, the small-scale renovation of a 220kV substation in Beijing effectively solved problems such as soil settlement, concrete cracks, and leakage through finite element simulation and geogrid reinforcement techniques, providing technical reference for civil construction in the power industry.”
    • Rural Electrification   Issue 5, Pages: 14-17, 72(2025)
    • DOI:10.13882/j.cnki.ncdqh.2503A067    

      CLC: TM727;32400.14.ncdqh.2503A067
    • Received:27 March 2025,

      Published:10 May 2025

    移动端阅览

  • Ge GAO, Demin WANG, Hanxiong GAO, et al. Analysis of the Difficulties and Paths of Civil Construction in the Miniaturization Transformation of Substations[J]. Rural Electrification, 2025, (5): 14-17, 72. DOI: 10.13882/j.cnki.ncdqh.2503A067.

  •  
  •  

0

Views

24

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Thinking and Practice on Coordination Management of Civil Construction and Electrical Engineering in Substation

Related Author

Junzhu HU

Related Institution

State Grid Beijing Changping Power Supply Company, Beijing Changping
0