HUANG Li, XIONG Xianyue, WANG Feng, et al. A new method for determining factors Influencing productivity of deep coalbed methane vertical cluster wells[J]. Petroleum Reservoir Evaluation and Development, 2024, 14(6): 990-996.
DOI:
HUANG Li, XIONG Xianyue, WANG Feng, et al. A new method for determining factors Influencing productivity of deep coalbed methane vertical cluster wells[J]. Petroleum Reservoir Evaluation and Development, 2024, 14(6): 990-996. DOI: 10.13809/j.cnki.cn32-1825/te.2024.06.022.
A new method for determining factors Influencing productivity of deep coalbed methane vertical cluster wells
The desorption production patterns of deep coalbed methane(CBM) vertical cluster wells
as well as the transition timing between free gas and desorbed gas
remain unclear. The dominant factors causing productivity differences are still uncertain
which hinders productivity improvement. To further evaluate the primary factors controlling productivity
a new method for assessing productivity-influencing factors was developed
based on the production dynamic parameters of 36 vertical cluster wells and using neural networks to predict bottom-hole flowing pressure. This method centered on the initial meter gas production index and integrated multiple machine-learning algorithms. The results showed that: 1) The Beggs Bill model and Gray model exhibited poor applicability for predicting the bottom-hole flowing pressure of deep CBM wells
while the single-phase gas model demonstrated reduced overall error as water production declined. Predictions using the neural network method were more accurate
with a relative error of less than 10% compared to measured values. 2) Using Kendall's tau-b correlation analysis
the discrete dominant factor was identified as the microstructural position
primarily located in uplifted positive structural zones
with the secondary factor being fracture development
categorized mainly as “well-developed” or “developed.” 3) By combining lasso regression-random forest- decision tree algorithm to iteratively eliminate irrelevant factors
the continuous dominant factors influencing productivity were ranked in descending order as: ash content
average construction discharge rate
total sand volume pumped
flowback rate at gas breakthrough
net pay thickness
acoustic travel time
gamma ray log value
average construction pressure
percentage of 100-mesh sand
and average gas measurement value. Engineering factors were found to have a significant impact on gas well productivity and cannot be overlooked. This method leverages the advantages of multiple machine-learning algorithms
demonstrating strong operability and improving the accuracy of CBM dynamic predictions. It aids in optimizing fracturing design parameters and provides a scientific basis for enhancing post-fracturing productivity in CBM wells.