Key engineering technologies of one-million-ton CCUS transportation-injection-extraction in Shengli Oilfield
CCUS technology is a crucial technology for achieving the goal of “dual carbon”
involving process such as capture
transportation
injection
extraction and re-injection. Shengli Oilfield has developed essential engineering technologies for transportation and injection through years of exploration. To manage the phase changes of CO
2
and the risks of long-distance leakage due to pressure loss and temperature variations
a safety transportation technology for long-distance CO
2
pipelines was es
tablished. This technology is based on phase state control
ensuring efficient and cost-effective transportation. developed China’s first casing pipeline transport pump; and built China’s longest long-distance supercritical pressure CO
2
pipeline
which makes up for the shortcomings of the long-distance CO
2
transport in China. In order to meet the needs of high-pressure injection of large-displacement CO
2
in the demonstration project
China’s first high-pressure dense-phase injection pump has been developed
realizing high-pressure dense-phase injection of 40 MPa. In view of the problems of high injection pressure
high gas-to-liquid ratio
low pumping efficiency
and corrosion of CO
2
the engineering process technology of injection and extraction supporting such as safe injection of gas pipeline columns for pressure-free wells
multi-functional oil recovery pipeline columns
and corrosion prevention of CO
2
repulsion has been formed to realize high-efficiency
safe injection and extraction and long-lasting corrosion protection. China's first multi-field
multi-node
one-million-ton CCUS demonstration project integrating pipeline transport engineering
injection equipment
flooding and sequestration
injection-extraction process
and gathering-transmission and re-injection
has been operating well and realizing “smooth
safe
efficient and green” operation in all aspects. This summary of the one-million-ton CCUS transportation-injection-extraction process and supporting equipment in Shengli Oilfield is intended to provide reference and guidance for the construction of subsequent CCUS project.