您当前的位置:
首页 >
文章列表页 >
Evaluation of geological engineering factors for productivity of deep CBM well after fracturing based on grey correlation method
更新时间:2025-12-05
    • Evaluation of geological engineering factors for productivity of deep CBM well after fracturing based on grey correlation method

    • Petroleum Reservoir Evaluation and Development   Vol. 13, Issue 4, Pages: 433-440(2023)
    • DOI:10.13809/j.cnki.cn32-1825/te.2023.04.004    

      CLC: TE32+8
    • Published:2023

    移动端阅览

  • KONG Xiangwei, XIE Xin, WANG Cunwu, et al. Evaluation of geological engineering factors for productivity of deep CBM well after fracturing based on grey correlation method[J]. Petroleum Reservoir Evaluation and Development, 2023, 13(4): 433-440. DOI: 10.13809/j.cnki.cn32-1825/te.2023.04.004.

  •  
  •  

0

Views

160

下载量

10

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation study on the influence of coal rock fracture morphology on seepage capacity

Related Author

SHI Leiting
ZHAO Qiming
REN Zhenyu
ZHU Shijie
ZHU Shanshan

Related Institution

State Key Laboratory of Oil and Gas Reservoir Geology and Development Engineering, Southwest Petroleum University
Chongqing Energy College
China United Coalbed Methane Corp. Ltd.
School of Petroleum Engineering, Chongqing University of Science & Technology
0