您当前的位置:
首页 >
文章列表页 >
Optimum time of tubing installation in deep shale gas wells of Weirong
更新时间:2025-12-05
    • Optimum time of tubing installation in deep shale gas wells of Weirong

    • Petroleum Reservoir Evaluation and Development   Issue 3, Pages: 526-533(2022)
    • DOI:10.13809/j.cnki.cn32-1825/te.2022.03.015    

      CLC: E931.2
    • Published:2022

    移动端阅览

  • DU Yang, NI Jie, LEI Wei, et al. Optimum time of tubing installation in deep shale gas wells of Weirong[J]. Petroleum Reservoir Evaluation and Development, 2022, (3): 526-533. DOI: 10.13809/j.cnki.cn32-1825/te.2022.03.015.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

52

下载量

3

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research and application of fiber fracturing and fiber temporary plugging technology for deep shale gas
Genesis of reservoir heterogeneity in deep shale gas reservoirs of the Lower Silurian Longmaxi Formation, Dazu Block, Western Chongqing
Extendability limit of engineering drilling in long horizontal section of Weirong deep shale gas

Related Author

HU JUNJIE
LU CONG
GUO JIANCHUN
ZENG BO
GUO XINGWU
MA LI
SUN YUDUO
ZHANG LI

Related Institution

State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University
Shale Gas Research Institute, PetroChina Southwest Oil & Gasfield Company
Shale Gas Evaluation and Exploitation Key Laboratory of Sichuan Province
Chongqing University of Science and Technology
Chongqing Shale Gas Exploration and Development Company Limited
0