您当前的位置:
首页 >
文章列表页 >
Plugging removal technology of wellbore after fracturing in deep shale gas wells:A case study of Well-WY23-1HF
更新时间:2025-07-10
    • Plugging removal technology of wellbore after fracturing in deep shale gas wells:A case study of Well-WY23-1HF

    • Petroleum Reservoir Evaluation and Development   Issue 2, Pages: 96-100(2021)
    • DOI:10.13809/j.cnki.cn32-1825/te.2021.02.013    

      CLC: TE37
    • Published:2021

    移动端阅览

  • WANG Xiaogang, SHI Xuezhi, ZHU Min. Plugging removal technology of wellbore after fracturing in deep shale gas wells:A case study of Well-WY23-1HF[J]. Petroleum Reservoir Evaluation and Development, 2021, (2): 96-100. DOI: 10.13809/j.cnki.cn32-1825/te.2021.02.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Application of tractor in perforation of shale gas horizontal wells
Layer series division for development of shale gas of Pingqiao anticline in Nanchuan Block and reasonable well spacing optimization
Optimization and application of fracture control and channeling prevention technology in Weiyuan shale gas horizontal well
Intelligent evaluation of shale gas resources
Study on Cooling Wastewater Treatment of Diesel Locomotive

Related Author

WANG Junfang
ZHANG Longfu
XIA Haibang
WANG Yuhai
FANG Dazhi
QIAN Jin
MEI Junwei
REN Jianhua

Related Institution

Sinopec East China Oil and Gas Company
Sinopec Chongqing Shale Gas Co., Ltd.
Research Institute of Exploration and Development, Sinopec East China Oil and Gas Company
Downhole Services Company, CNPC Chuanqing Drilling Engineering Company Limited
School of Energy Resources, China University of Geosciences
0