WANG Xiaogang, SHI Xuezhi, ZHU Min. Plugging removal technology of wellbore after fracturing in deep shale gas wells:A case study of Well-WY23-1HF[J]. Petroleum Reservoir Evaluation and Development, 2021, (2): 96-100.
WANG Xiaogang, SHI Xuezhi, ZHU Min. Plugging removal technology of wellbore after fracturing in deep shale gas wells:A case study of Well-WY23-1HF[J]. Petroleum Reservoir Evaluation and Development, 2021, (2): 96-100. DOI: 10.13809/j.cnki.cn32-1825/te.2021.02.013.
Plugging removal technology of wellbore after fracturing in deep shale gas wells:A case study of Well-WY23-1HF
After large-scale volume fracturing of deep shale gas "wells
there comes the difficulty of wellbore plugging
which affects long-term production.The common methods to remove the wellbore plugging by coiled tubing and drill pipe are simple.It lacks of the pertinence measures to treat the diameter shaft and the mixed stemming.For example
Well-WY23-1HF can not produce normally due to the fracturing of adjacent well.The formation collapses and the cuttings enter the wellbore
causing serious plugging.The trajectory of its plugging section is of the complex situation of warped
casing deformation and so on.The measures of plugging removal and resuming production are drill-grinding string
drill-grinding process
well killing fluid design
etc.The field application shows that the same type of bridge plug should be used to reduce the impact of tapering
ensure the smooth trajectory
prevent the accumulation of plugging material
and avoid the complication of wellbore conditions for multi-stage fracturing of horizontal wells.At the same time
combined with the comprehensive application of soluble bridge plug and large diameter noneasy-to-drill bridge plug
the combination of pipe string with oil flushing with nibs+drill pipe with bit(or milling shoe) is adopted to remove plug
and the recovery of production is successfully achieved.This technology provides a reference for similar shale gas wells.