He Yunfeng, Yang Xiaoteng. Relation between water invasion coefficient and stable production period in gas reservoirs with active edge water[J]. Petroleum Reservoir Evaluation and Development, 2021, (1): 124-128.
He Yunfeng, Yang Xiaoteng. Relation between water invasion coefficient and stable production period in gas reservoirs with active edge water[J]. Petroleum Reservoir Evaluation and Development, 2021, (1): 124-128. DOI: 10.13809/j.cnki.cn32-1825/te.2021.01.017.
Relation between water invasion coefficient and stable production period in gas reservoirs with active edge water
there is no particularly effective method to predict the degree of production at the end of the stable production period of gas reservoirs with active edge water. The production often declines rapidly without warning. Based on the physical model of long core of gas reservoirs by water flooding in Yakela area
the characteristics of gas-water two-phase seepage during water invasion are simulated by the experiment of gas recovery by water flooding. Taking the material balance equation of water flooding as the theoretical method
the concept of water invasion coefficient is introduced to describe the water invasion characteristics of gas reservoirs. As the hydrocarbon pore volume(HPV)of the injected water is consistent with the concept of water invasion coefficient
it is feasible to simulate the effect of water invasion on gas reservoir by water flooding experiments. The experimental results show that when the injected water reached 0.3 ~ 0.45 times of HPV
the waterflood front breaks through
and the gas production enters the rapid decline period from the stable production period. The production history shows that when the water invasion coefficients of the middle-lower gas reservoir reach 0.33 ~ 0.36
the gas production decreases rapidly
and the experiment is basically consistent with the production practice. By calculating the water invasion coefficient of upper gas reservoir
when the water invasion coefficients reach 0.33 ~ 0.36 from August 2019 to February 2020
the end of stable production period will come. It is basically consistent with the results of numerical simulation and necessary to adjust the high risk wells in time.