您当前的位置:
首页 >
文章列表页 >
Optimization and application of tail pipe suspension device installed on electric submersible pump for super heavy oil
更新时间:2025-12-11
    • Optimization and application of tail pipe suspension device installed on electric submersible pump for super heavy oil

    • Petroleum Reservoir Evaluation and Development   Vol. 10, Issue 2, Pages: 107-110(2020)
    • DOI:10.13809/j.cnki.cn32-1825/te.2020.02.018    

      CLC: TE355
    • Published:2020

    移动端阅览

  • WANG Leilei, LIANG Zhiyan, QIU Zhenjun, et al. Optimization and application of tail pipe suspension device installed on electric submersible pump for super heavy oil[J]. Petroleum Reservoir Evaluation and Development, 2020, 10(2): 107-110. DOI: 10.13809/j.cnki.cn32-1825/te.2020.02.018.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

6

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Dynamic quantitative characterization and automatic identification of the buried hill reservoir types in Yakela block
Enhanced oil recovery and parameter optimization of hydrocarbon injection in fractured-cavity reservoirs
Experiments on CO2 flooding mechanism for Tahe sandstone reservoir with strong bottom water
Study on relationship optimization of injection and production in fractured-vuggy reservoirs with different karst background
Development technology and research direction of fractured-vuggy carbonate reservoirs in Tahe Oilfield

Related Author

WANG Xiao
XU Jian
YANG Xiaoteng
GUO Zhongchun
LI Weiqi
REN Hong
CHENG Xiaojun
TAN Tao

Related Institution

PetroChina Dagang Oilfield company
China University of Geosciences (Wuhan), Department of Petroleum Engineering
Sinopec Northwest Oilfield Company Yakela gasfield, Kuqa
Sinopec Key Laboratory of Enhanced Recovery of Fracture-Cave Reservoir
Sinopec Northwest Oilfield Company
0