您当前的位置:
首页 >
文章列表页 >
A new method of liquid production rate prediction with different water cut
更新时间:2025-12-05
    • A new method of liquid production rate prediction with different water cut

    • Petroleum Reservoir Evaluation and Development   Vol. 9, Issue 1, Pages: 34-37(2019)
    • DOI:10.13809/j.cnki.cn32-1825/te.2019.01.007    

      CLC: E331
    • Published:2019

    移动端阅览

  • Ling Haochuan, Zhou Haiyan, Shi Hongfu, et al. A new method of liquid production rate prediction with different water cut[J]. Petroleum Reservoir Evaluation and Development, 2019, 9(1): 34-37. DOI: 10.13809/j.cnki.cn32-1825/te.2019.01.007.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on variation in decline rate with water cut using relative permeability curves
Relative permeability model of polymer particle dispersed phase for oil displacement based on fractal theory
Study on Cooling Wastewater Treatment of Diesel Locomotive
The Method of Noise Prediction for Elevated Railway
The Establishment and Improvement of the Construction and Evaluation Standards on the Water Supply Concentrated Monitor and Control System

Related Author

MA Peishen
SUN Yili
SHU Zheng
TAN Yeqiang
YU Qiang
ZHANG Wei
WU Changhu
QI Yong

Related Institution

Research Institute of Exploration and Development, Sinopec Henan Oilfield Compary
State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University
No.1 Oil Production Plant, Sinopec Henan Oilfield Compary
State Key Laboratory of Deep Oil and Gas, China University of Petroleum(East China)
West-to-East Gas Pipeline Company, National Petroleum and Natural Gas Pipe Network Group Co., Ltd.
0