Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults
New Energy and Grid Planning and Operation|更新时间:2026-10-14
|
Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults
Southern Power System TechnologyVol. 20, Issue 9, Pages: 25-36(2026)
作者机构:
1.智能配用电装备与系统全国重点实验室(天津大学),天津 300072
2.国网浙江省电力有限公司温州供电公司,浙江 温州 325000
作者简介:
基金信息:
the National Key Research and Development Program of China(2023YFB2406700);the National Natural Science Foundation of China(52477118;525B2115);the Science and Technology Project of State Grid Zhejiang Electric Power Co., Ltd(5211WZ26000G)
LI Xialin,LUO Yuxuan,XIANG Yeyun,et al.Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults[J].Southern Power System Technology,2026,20(09):25-36.
LI Xialin,LUO Yuxuan,XIANG Yeyun,et al.Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults[J].Southern Power System Technology,2026,20(09):25-36.DOI: 10.13648/j.cnki.issn1674-0629.2026.09.003.
Parameter Feasible Region Construction for Voltage-Source Transient Synchronization Stability of Grid-Forming Energy Storage System Under Faults