您当前的位置:
首页 >
文章列表页 >
富春江水电厂2号水轮机技术改造的可行性分析
更新时间:2026-01-21
    • 富春江水电厂2号水轮机技术改造的可行性分析

    • Issue 3, Pages: 16-17(2000)
    • DOI:10.13599/j.cnki.11-5130.2000.03.004    

      CLC: TV734
    • Published:2000

    移动端阅览

  • 吕孟东. 富春江水电厂2号水轮机技术改造的可行性分析[J]. 2000, (3): 16-17. DOI: 10.13599/j.cnki.11-5130.2000.03.004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

50

下载量

1

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Technical transformation and capacity expansion of 2#F hydrogenerator in Zhuqingbei Hydropower Station
凌津滩电厂水轮机转轮室减振研究及应用
On-site machining technology of large hydraulic turbine seat ring
Vibration signal feature extraction of hydropower units based on improved EEMD and ICA algorithm
Turbine model review test and performance analysis of Wuqiangxi Hydropower Station expansion project

Related Author

LUO Zheng-ning
黄星德
田劲松
WANG Shi-lin
ZHANG Xin-hua
ZHONG Yong
YUAN Xiang
杨峰雄

Related Institution

清流县优恩电力有限责任公司
五凌电力有限公司凌津滩电厂
湖南省水电智慧化工程技术研究中心
中国水利水电第十四工程局有限公司机电安装事业部
国家电力投资集团水电产业创新中心
0