您当前的位置:
首页 >
文章列表页 >
基于AHP-TOPSIS-灰关联的交叉跨越施工难度分析
更新时间:2026-04-23
    • 基于AHP-TOPSIS-灰关联的交叉跨越施工难度分析

    • Electric Power Survey   Issue 2, Pages: 80-88(2026)
    • DOI:10.13500/j.dlkcsj.issn1671-9913.2026.02.013    

      CLC: TM752
    • Published:2026

    移动端阅览

  • 王寒梅, 熊竣熙, 陈柯羽, et al. 基于AHP-TOPSIS-灰关联的交叉跨越施工难度分析[J]. Electric Power Survey, 2026, (2): 80-88. DOI: 10.13500/j.dlkcsj.issn1671-9913.2026.02.013.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

陕北砂黄土地区边坡上部塔位安全避让距离评价方法
Application of Analytic Hierarchy Process in the Scheme Optimizing of Ground Treatment
Quality Hidden Danger of Plane Cross Section Survey in Power Transmission Line
Comprehensive Evaluation Used for Bid Evaluation of Power Plant Project Based on Delphi and Analytic Hierarchy Process
Evaluation Method of Electric Construction Item Based on Fuzzy-AHP

Related Author

李良
李健强
宋世鑫
蔡升华
刘挺
奚毓敏
李彦萍
王圣江

Related Institution

中国能源建设集团陕西省电力设计院有限公司
苏源集团江苏房地产有限公司,江苏省电力公司 江苏南京210024
江苏省电力设计院
山西省电力勘测设计院
云南省电力调度中心
0