This article analyzes the characteristics and the problems faced in quality management of power generation EPC projects led by design institutes.It proposes the response strategies of the concept of“Begin with the End in Mind”
Total Quality Management
Three dimensional quality management system
and control measures for design
procurement and materials
construction management.Good practical results have been achieved in the EPC project of the gas turbine engineering that the author participated in.