This article focuses on the research and analysis of lightning protection against overvoltage during the operation of waterway engineering. In order to ensure the safe
stable
and economical operation of a hydropower station after its commissioning
the ATP-EMTP calculation program was used to simulate and calculate the lightning intrusion wave
bypass strike
and counterattack lightning overvoltage of the electrical equipment in the endpoint overvoltage protection area of the project
namely the voltage boosting station
under different operating modes. The study provides a reasonable configuration plan for engineering lightning arresters
insulation levels that meet the requirements of the specifications
and insulation coordination margins. A typical tower calculation model for power station incoming line segment was proposed
and the maximum overvoltage value on electrical equipment was given when lightning strikes and bypasses different towers. The overvoltage simulation calculation method used in the study is applicable to hydropower projects of the same scale with shipping requirements both domestically and internationally.