As one of the advanced technologies in the field of large capacity and high parameter coal-fired power generation
the backpressure extraction steam turbine(BEST) dual turbine regenerative system is significantly different from the conventional regenerative system in design.This article analyzes and summarizes the BEST dual turbine regenerative system design in double reheat unit including unit regenerative system setting features
shafting power matching
speed control
back pressure control
etc.The investment and benefit of scheme is analyzed
and the calculation result shows that the BEST dual turbine regenerative system scheme in double reheat unit demons trates good economic performance.