您当前的位置:
首页 >
文章列表页 >
Short Process Steel Enterprises' Participation in Multi-day Unit Commitment Optimization of Power System Considering Production Time Sequence Coupling
更新时间:2026-03-13
    • Short Process Steel Enterprises' Participation in Multi-day Unit Commitment Optimization of Power System Considering Production Time Sequence Coupling

    • Vol. 50, Issue 2, Pages: 641-650(2026)
    • DOI:10.13335/j.1000-3673.pst.2025.0646    

      CLC: TM73
    • Published:2026

    移动端阅览

  • 程俊超, 1, 包铭磊, et al. Short Process Steel Enterprises' Participation in Multi-day Unit Commitment Optimization of Power System Considering Production Time Sequence Coupling[J]. 2026, 50(2): 641-650. DOI: 10.13335/j.1000-3673.pst.2025.0646.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

307

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

考虑电热老化效应的数据驱动电热氢氨耦合微网分布鲁棒规划
Regional Low-carbon Integrated Energy System Planning: Key Technologies and Challenges

Related Author

李龙艳
刘淑娴
宁超
YANG Long
ZHANG Shenxi
CHENG Haozhong
Lü Jiawei

Related Institution

上海交通大学电子信息与电气工程学院
Department of Electrical Engineering, Shanghai Jiaotong University
Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education, Shanghai Jiao Tong University
0