您当前的位置:
首页 >
文章列表页 >
Optimal Scheduling Method of Cascade Hydropower Driven by ReAct Paradigm of Large Language Model
更新时间:2026-09-28
    • Optimal Scheduling Method of Cascade Hydropower Driven by ReAct Paradigm of Large Language Model

    • Vol. 46, Issue 14, Pages: 5755-5771(2026)
    • DOI:10.13334/j.0258-8013.pcsee.250771    

      CLC:
    • Published:2026

    移动端阅览

  • ZHAO Zhipeng, HAN Yongdong, CHENG Chuntian, et al. Optimal Scheduling Method of Cascade Hydropower Driven by ReAct Paradigm of Large Language Model[J]. 2026, 46(14): 5755-5771. DOI: 10.13334/j.0258-8013.pcsee.250771.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

23

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Multi-condition Dynamic Degradation Characteristics of PEMFC Using TCN-LSTM and Transfer Learning
Surface Water Film Simulation Research on Biomimetic Stator Imitating Diamond Cell Structure
Series-capacitor-transformer Hybrid High Step-down Ratio Buck Converter
Real-time Optimal Scheduling of Cascaded Hydropower Stations Under High-intensity Peak Shaving and Frequency Regulation
Identification of Critical Equipment in Transmission Systems Considering Low Granularity Temporal Malicious Attacks Under Regional Outage Scenarios

Related Author

No data

Related Institution

No data
0