您当前的位置:
首页 >
文章列表页 >
Substation Main Electrical Connection Operational Risk Assessment Method Based on Time-varying Graph
更新时间:2026-10-12
    • Substation Main Electrical Connection Operational Risk Assessment Method Based on Time-varying Graph

    • Vol. 46, Issue 9, Pages: 3642-3653(2026)
    • DOI:10.13334/j.0258-8013.pcsee.242807    

      CLC:
    • Received:05 May 2026,

      Published:2026

    移动端阅览

  • YANG Huiyuan, TANG Aihong, LIU Shouwen, et al. Substation Main Electrical Connection Operational Risk Assessment Method Based on Time-varying Graph[J]. 2026, 46(9): 3642-3653. DOI: 10.13334/j.0258-8013.pcsee.242807.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Entrepreneurship drives breakthrough innovation and enterprise total factor productivity
Federated Split Reinforcement Learning-driven Privacy-preserving Coordinated Operation Method for Distribution Network and Buildings
The impact of green transformational leadership on radical green innovation
Data-driven Modeling of Organic Rankine Cycle Based on Long Short-term Memory Networks
Development of an Open-source High-performance Simulation Modeling Tool for Integrated Energy Systems

Related Author

No data

Related Institution

No data
0