Energy Storage Configuration Method in the Production Simulation Process of Large-scale Wind-solar-storage Power Stations Under Electricity Spot Market
|更新时间:2026-02-01
|
Energy Storage Configuration Method in the Production Simulation Process of Large-scale Wind-solar-storage Power Stations Under Electricity Spot Market
YAN Xiaohe, XIONG Zihao, LIU Nian, et al. Energy Storage Configuration Method in the Production Simulation Process of Large-scale Wind-solar-storage Power Stations Under Electricity Spot Market[J]. 2025, (21): 8445-8458.
DOI:
YAN Xiaohe, XIONG Zihao, LIU Nian, et al. Energy Storage Configuration Method in the Production Simulation Process of Large-scale Wind-solar-storage Power Stations Under Electricity Spot Market[J]. 2025, (21): 8445-8458. DOI: 10.13334/j.0258-8013.pcsee.241033.
Energy Storage Configuration Method in the Production Simulation Process of Large-scale Wind-solar-storage Power Stations Under Electricity Spot Market
With the introduction of China's 'dual carbon' goals
the green electricity economy is rapidly developing
making wind-solar-storage power stations a key model for scaling up new energy. Concurrently
the electricity spot market is undergoing continuous reform
which means that the rational allocation of storage capacity has become crucial to enhancing the economic viability of these stations. On this basis
this paper proposes a method for configuring energy storage that considers the clearing of the electricity spot day-ahead and real-time markets
along with the production simulation process of large-scale wind-solar-storage power stations. First
a dual-layer model for storage allocation and operation across multiple time scales is established
based on long-term production simulation and short-term market clearing. The upper layer addresses the energy storage allocation problem under the market model
while the lower layer deals with the production simulation of the station under the market model. Then
a hierarchical- divisive clustering method is used for multi-scenario allocation. The production simulating of wind-solar-storage power stations is proposed
under the market model
taking into account the collaborative interactions between wind
solar
and storage. Finally
a multi-time temporal coupling framework is established. By transforming the sequential timing into stacked parallel
a method for temporal decoupling of the day-ahead and real-time dual-layer model arising from overlapping multiple time scales is designed. The effectiveness of the proposed method is validated using actual relevant data from the Ulanqab wind-solar-storage power station. The results show that configuring storage with a duration of 3.5 to 4 hours of full-power charging and discharging can effectively ensure the economic benefits of wind-solar-storage power stations in the market model.