For the energy flow with the transmission delay property participating in the power grid dispatching
its departure and arrival time are often directly rounded to adapt the classical hourly day-ahead dispatching system
resulting in large errors of the optimization results. Meanwhile
if the scheduling time unit is refined and then rectified
the number of the optimization variables and solution pressure will increase significantly. Therefore
a new microgrid optimization scheduling model which can adapt the day-ahead scheduling system was established in this paper
and it is applied to the energy economic scheduling of pelagic clustering islands. Firstly
considering the energy flow between islands based on the electric vessel(EV)
the comprehensive influence of the environmental factor field on energy supply-transmissiondemand was quantitatively analyzed. Furthermore
an inter-island energy transfer model compatible with differential delay time was established. On this basis
to solve the non-integral point problem of inter-island energy flow transmission delay
a microgrid optimal scheduling strategy adapting to the day-ahead scheduling system was proposed. Finally
the fast group search optimizer algorithm was used to achieve the efficient solution. The simulation results verify the rationality and feasibility of the proposed strategy.