您当前的位置:
首页 >
文章列表页 >
Two-Stage Stochastic Optimization for Data Centers Considering Wind and PV Power Uncertainty and Computational Flexibility
Hosted by KANG Chongqing, DU Ershun, DAI Jing, LU Haifeng, CHENG Zhijiang, WANG Yongzhen, DING Zhaohao, DONG Chaowu | 更新时间:2026-07-23
    • Two-Stage Stochastic Optimization for Data Centers Considering Wind and PV Power Uncertainty and Computational Flexibility

    • Electric Power Construction   Vol. 47, Issue 7, Pages: 14-24(2026)
    • DOI:10.12204/j.issn.1000-7229.2026.07.002    

      CLC: TM732
    • Received:14 February 2026,

      Revised:2026-04-09,

      Online First:02 July 2026,

      Published:01 July 2026

    移动端阅览

  • LU Hao,LI Wenbo,CAI Jizeng,et al.Two-Stage Stochastic Optimization for Data Centers Considering Wind and PV Power Uncertainty and Computational Flexibility[J].Electric Power Construction,2026,47(07):14-24. DOI: 10.12204/j.issn.1000-7229.2026.07.002.

  •  
  •  

0

Views

1

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Electricity-Carbon Coordinated Dispatching Strategy for Interconnected Data Centers Based on Nodal Carbon Potential
A Preliminary Exploration on the Terminology and Standard System for Computing Power-Electricity-Heat Synergy
Stochastic Optimal Dispatching of Photovoltaic-Storage Direct Current Flexible Microgrids Considering Demand Response Delay
Coordinated Optimal Configuration of Hybrid Energy Storage for Microgrids with Differentiated Requirements on Both Source and Load Sides
Transient Stability Assessment of Power Systems Based on Graph Transformer

Related Author

GUO Shaoqing
LIU Guozhong
LIU Jiawen
HUAN Jiajia
CHEN Biyun
WEN Fushuan
HAN Yibo
WANG Yongzhen

Related Institution

School of Electrical Engineering Intelligentization, Dongguan University of Technology, Dongguan 523808, Guangdong;Province
Gird Planning Research Center, Guangdong Power Grid Co., Ltd.
School of Electrical Engineering, Guangxi University
College of Electrical Engineering, Zhejiang University
Beijing Laboratory for System Engineering of Carbon Neutrality, Beijing Institute of Technology
0