Two-Layer Iterative Robust Planning Framework for Hybrid Energy Storage in Industrial Parks Considering Balancing Demand Power Defense,Peak Shaving, and Frequency Regulation
Renewable Energy and Energy Storage|更新时间:2026-06-10
|
Two-Layer Iterative Robust Planning Framework for Hybrid Energy Storage in Industrial Parks Considering Balancing Demand Power Defense,Peak Shaving, and Frequency Regulation
Electric Power ConstructionVol. 47, Issue 6, Pages: 166-179(2026)
作者机构:
1.山东省新型配用电技术与装备重点实验室,山东省淄博市 255000
2.山东理工大学电气与电子工程学院,山东省淄博市 255000
3.山东大学电气工程学院,济南市 250061
作者简介:
基金信息:
Smart Grid-National Science and Technology Major Project (2030)(2025ZD085000);National Natural Science Foundation of China(52377110)
XU Maoxi,CHEN Jiajia,CONG Xinpeng,et al.Two-Layer Iterative Robust Planning Framework for Hybrid Energy Storage in Industrial Parks Considering Balancing Demand Power Defense,Peak Shaving, and Frequency Regulation[J].Electric Power Construction,2026,47(06):166-179.
XU Maoxi,CHEN Jiajia,CONG Xinpeng,et al.Two-Layer Iterative Robust Planning Framework for Hybrid Energy Storage in Industrial Parks Considering Balancing Demand Power Defense,Peak Shaving, and Frequency Regulation[J].Electric Power Construction,2026,47(06):166-179.DOI: 10.12204/j.issn.1000-7229.2026.06.013.
Two-Layer Iterative Robust Planning Framework for Hybrid Energy Storage in Industrial Parks Considering Balancing Demand Power Defense,Peak Shaving, and Frequency Regulation