Key Parameter Estimation Method for Frequency Modulation of Receiving- End Grid-Forming Converters Considering Damping Control
Risk Assessment and Risk Control for New Power System\·Hosted by CHEN Haoyong\, ZHANG Yongjun\, ZHANG Pei\, YE Yujian\, XIAO Dongliang\·|更新时间:2026-07-24
|
Key Parameter Estimation Method for Frequency Modulation of Receiving- End Grid-Forming Converters Considering Damping Control
Electric Power ConstructionVol. 47, Issue 4, Pages: 1-15(2026)
作者机构:
1.分布式储能与微网河北省重点实验室(华北电力大学),河北省保定市 071003
2.国网陕西省电力有限公司榆林供电公司,陕西省榆林市 710048
作者简介:
基金信息:
National Science and Technology Major Project on Smart Grid(2025ZD0805201)
YAN Xiangwu,XU Yue,ZHANG Hui,et al.Key Parameter Estimation Method for Frequency Modulation of Receiving- End Grid-Forming Converters Considering Damping Control[J].Electric Power Construction,2026,47(04):1-15.
YAN Xiangwu,XU Yue,ZHANG Hui,et al.Key Parameter Estimation Method for Frequency Modulation of Receiving- End Grid-Forming Converters Considering Damping Control[J].Electric Power Construction,2026,47(04):1-15.DOI: 10.12204/j.issn.1000-7229.2026.04.001.
Key Parameter Estimation Method for Frequency Modulation of Receiving- End Grid-Forming Converters Considering Damping Control