您当前的位置:
首页 >
文章列表页 >
Key Issues and Prospects for Low-Carbon Operation and Scheduling of the New Power System from an Electricity-Carbon Coupling Perspective
Dispatch & Operation | 更新时间:2025-08-05
    • Key Issues and Prospects for Low-Carbon Operation and Scheduling of the New Power System from an Electricity-Carbon Coupling Perspective

    • Electric Power Construction   Vol. 46, Issue 7, Pages: 133-149(2025)
    • DOI:10.12204/j.issn.1000-7229.2025.07.011    

      CLC: TM73
    • Received:08 July 2024,

      Revised:2024-10-10,

      Published:01 July 2025

    移动端阅览

  • ZHAO Junhua,BAI Yan,WANG Zhidong.Key Issues and Prospects for Low-Carbon Operation and Scheduling of the New Power System from an Electricity-Carbon Coupling Perspective[J].Electric Power Construction,2025,46(07):133-149. DOI: 10.12204/j.issn.1000-7229.2025.07.011.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Review of Low-Carbon Co-Optimization Research on Demand-Side Flexibility Resources for New Power Systems
Research and Application of Intelligent Processing Technology for High-Power Shortage in Receiving End Power Grid with Multiple DC Inputs
Climate Risk Adaptation Analysis and Prospect of New Power System
Multi-Scenario Progressive Planning Optimization of Shared Energy Storage Under Dual-Carbon Goals

Related Author

HUA Haochen
Pathmanathan Naidoo
ZHANG Chongbiao
LI Bing
LIU Di
CHEN Xingying
GAN Lei
YU Kun

Related Institution

National Key Laboratory of New-type Power System Operation and Control (Tsinghua University)
Nanjing State Power South New Energy Technology Co., Ltd.
State Grid Zhejiang Jiashan Power Supply Co., Ltd.
School of Electrical and Power Engineering, Hohai University
Department of Electrical Engineering and Applied Electronic Technology, Tsinghua University
0