Bidirectional Collaborative Optimization Scheduling of Adjustable Resources in Computing Node and Power Node
Hosted by KANG Chongqing, DU Ershun, DAI Jing, LU Haifeng, CHENG Zhijiang, WANG Yongzhen, DING Zhaohao, DONG Chaowu|更新时间:2025-12-08
|
Bidirectional Collaborative Optimization Scheduling of Adjustable Resources in Computing Node and Power Node
“In the field of computing power and power resource collaboration, experts have constructed a bidirectional collaborative scheduling architecture and proposed a computing power collaborative optimization scheduling model, verifying its significant effects in reducing energy consumption costs and improving power grid stability.”
Electric Power ConstructionVol. 46, Issue 2, Pages: 13-25(2025)
作者机构:
华南理工大学电力学院,广州市 510641
作者简介:
基金信息:
National Natural Science Foundation of China(51937005);National Key Research and Development Program of China(2023YFB4203102)
ZHOU Qianyufan,YANG Ping,WAN Siyang,et al.Bidirectional Collaborative Optimization Scheduling of Adjustable Resources in Computing Node and Power Node[J].Electric Power Construction,2025,46(02):13-25.
ZHOU Qianyufan,YANG Ping,WAN Siyang,et al.Bidirectional Collaborative Optimization Scheduling of Adjustable Resources in Computing Node and Power Node[J].Electric Power Construction,2025,46(02):13-25. DOI: 10.12204/j.issn.1000-7229.2025.02.002.
Bidirectional Collaborative Optimization Scheduling of Adjustable Resources in Computing Node and Power Node