Research and Practice on Localization of Offshore Wind Turbines
New Energy|更新时间:2025-06-06
|
Research and Practice on Localization of Offshore Wind Turbines
“According to the latest report, experts have conducted in-depth research on the localization of key components of offshore wind turbines and successfully developed a 5 MW offshore wind turbine with a localization rate of over 95%, providing new impetus for the development of offshore wind power.”
Power Generation TechnologyVol. 44, Issue 5, Pages: 696-702(2023)
作者机构:
中国华能集团清洁能源技术研究院有限公司,北京市 昌平区 102218
作者简介:
基金信息:
National Key R&D Program of China(2020YFB1506600);Technology Projects of China Huaneng Group Co., Ltd(HNKJ20-H54)
SUN Caixin,ZHANG Bo,TANG Wei,et al.Research and Practice on Localization of Offshore Wind Turbines[J].Power Generation Technology,2023,44(05):696-702. DOI: 10.12096/j.2096-4528.pgt.22030.
Research and Practice on Localization of Offshore Wind Turbines