您当前的位置:
首页 >
文章列表页 >
Preliminary Analysis of the 2·15 Power Outage in Texas, U.S. and Its Enlightenment to the Construction of China's Electricity Market
Power System Planning | 更新时间:2025-07-04
    • Preliminary Analysis of the 2·15 Power Outage in Texas, U.S. and Its Enlightenment to the Construction of China's Electricity Market

    • Power Generation Technology   Vol. 42, Issue 1, Pages: 131-139(2021)
    • DOI:10.12096/j.2096-4528.pgt.21016    

      CLC: TM73
    • Received:25 February 2021

      Published:28 February 2021

    移动端阅览

  • Zeyang LIU, Zhaoxia JING. Preliminary Analysis of the 2·15 Power Outage in Texas, U.S. and Its Enlightenment to the Construction of China's Electricity Market[J]. Power Generation Technology, 2021, 42(1): 131-139. DOI: 10.12096/j.2096-4528.pgt.21016.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A Two-Stage Optimization Strategy for Virtual Power Plants Considering the Electricity-Hydrogen Market
Review of Virtual Power Plant Under the Background of “Dual Carbon”
Architecture Design of Virtual Power Plant Based on “Three Flow Separation-Convergence”

Related Author

LI Xiaozhu
ZHANG Yichen
WANG Tianfeng
ZHANG Zhongming
YANG Yongli
ZHAO Hailing
LI Wei
WANG Yingxu

Related Institution

Xinjiang Power Trading Center Co., LTD., Urumqi 830017, Xinjiang Uygur Autonomous Region
School of Electrical Engineering, Xinjiang University, Urumqi 830046, Xinjiang Uygur Autonomous Region
School of Economics and Management, Northeast Electric Power University
School of Economics and Management, North China Electric Power University, Changping District
Huadian Electric Power Research Institute Co., Ltd.
0