您当前的位置:
首页 >
文章列表页 >
Regional Power Grid Planning Method Considering Hydropower Transmission and Load Center Function Properties
Energy Internet | 更新时间:2025-07-04
    • Regional Power Grid Planning Method Considering Hydropower Transmission and Load Center Function Properties

    • Power Generation Technology   Vol. 42, Issue 6, Pages: 741-750(2021)
    • DOI:10.12096/j.2096-4528.pgt.20119    

      CLC: TK79;TM715.3
    • Received:26 March 2021,

      Published:31 December 2021

    移动端阅览

  • Tongyan ZHANG, Fei TANG, Qingfen LIAO, et al. Regional Power Grid Planning Method Considering Hydropower Transmission and Load Center Function Properties[J]. Power Generation Technology, 2021, 42(6): 741-750. DOI: 10.12096/j.2096-4528.pgt.20119.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A Planning Method for Anti-disaster Backbone Grid Considering Economy and Reliability
Implementation of Core Algorithm of Electrical Calculation in Grid Planning System

Related Author

LUO Chunhui
ZOU Tonghua
QU Gangju
TANG Tao
CHI Fujian
SUN Kuo
ZHANG Zhang
ZHANG Yuan

Related Institution

Hunan Electric Power Transmission and Transformation Engineering Co., Ltd.
Hunan Province Key Laboratory of Smart Grids Operation and Control (Changsha University of Science and Technology)
State Grid Tianjin Electric Power Company, Hebei District
Beijing T&D Science and Technology Corporation, Changping District
0