您当前的位置:
首页 >
文章列表页 >
Analysis and Application of Fast Closing Boundary Conditions for Governing Valves of 1 000 MW Ultra-supercritical Unit
Power Generation and Enviromental Protection | 更新时间:2025-07-04
    • Analysis and Application of Fast Closing Boundary Conditions for Governing Valves of 1 000 MW Ultra-supercritical Unit

    • Power Generation Technology   Vol. 41, Issue 6, Pages: 689-696(2020)
    • DOI:10.12096/j.2096-4528.pgt.20004    

      CLC: TK38
    • Received:11 March 2020,

      Published:31 December 2020

    移动端阅览

  • Xiaohui SONG, Heng LIANG, Xinming CHEN, et al. Analysis and Application of Fast Closing Boundary Conditions for Governing Valves of 1 000 MW Ultra-supercritical Unit[J]. Power Generation Technology, 2020, 41(6): 689-696. DOI: 10.12096/j.2096-4528.pgt.20004.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on Deep Peak Shaving Performance of 1 000 MW Ultra-Supercritical Coal-Fired Boiler
Optimization of 700℃ Ultra-supercritical Single Reheat Power Generation System

Related Author

DING Yong
Mei YANG
Yunlong ZHOU
Jinfu YANG
Di WANG
Dongjiang HAN
Jiaxin BAO

Related Institution

China Energy Jiangxi New Energy Industry Co., Ltd.
School of Energy and Power Engineering, Northeast Dianli University
Chinese Academy of Sciences University, Haidian District
0