High-speed rail needs 6 hours of repair time in the early morning every day
when it cannot be used. However
with the development of society
it is necessary to reduce the window time to improve the operation efficiency of high-speed rail. The traditional deformation monitoring system of high-speed railway track subgrade based on BDS (BeiDou Navigation Satellite System) needs one day observation time to accurately monitor the subgrade
but such observation time during the empty window period of ultra-high railway cannot play a role in improving the operation efficiency of high-speed railway. Particle filter algorithm is added to the original deformation monitoring algorithm. While trying to reduce the observation time to the high-speed railway empty window period
the particle filter algorithm is used to ensure that the coordinate values of the solved monitoring points meet the positioning accuracy requirements of the high railway base under the condition that the sampling data decreases substantially. An experimental simulation is carried out using the measured sampling data of BDS deformation monitoring system of Guangzhou-Shantou high-speed railway
and the effectiveness of particle filter algorithm is verified. The experimental results show that
with the help of particle filter algorithm
the observation time reduced to 15 min can ensure that the a
B and H coordinates of the monitoring points meet the accuracy requirement of ±5 mm for high railway base positioning
which provides an effective method and idea for reducing the time of high-speed railway gap period and improving the operation efficiency of high-speed railway.
关键词
Keywords
references
HU Y J, LIANG X M, XU C G. On the status quo and development trend of GPS technology for deformation monitoring [J]. Science of Surveying and Mapping, 2006(5): 155-157.
WANG Y G, ZHOU J P, LI Y J, et al . Analytical research of the inspecting instrument for high speed railway track based on the inertial position and azimuth determining technology [J ] . Navigation Positioning and Timing, 2018, 5(2): 70-74.
DAI Z H, LU P, ZHANG Z F, et al . Surface subsidence monitoring and analysis of Nanning based on PS-InSAR technology [J ] . Journal of Geodesy and Geodynamics, 2021, 41(5): 491-496.
XU Z, HUANG L M, LI B, et al . Analysis of GIS deformation monitoring accuracy in EHV substation using Beidou satellite navigation system [J ] . Zhejiang Electric Power, 2021, 40(4): 101-107.
JIANG W P, LIU H F, LIU W K, et al . CORS deve lopment for Xilongchi dam deformation monitoring [J ] . Geomatics and Information Science of Wuhan University, 2012, 37(8): 949-952.
LI L, ZHANG Y, SHI B M. Improved adaptive algorithm in face tracking of fusing Mean-shift and particle filtering [J]. Industrial Instrumentation and Automation Device, 2016(1): 82-85.
李会莹. 鲁棒滤波问题的若干研究[D]. 南京: 南京理工大学, 2007.
郝晶晶. 基于贝叶斯推理的故障诊断方法研究[D]. 北京: 北京交通大学, 2012.
ZHU F L, ZENG B, CAO J. Parallel optimization and implementation of SLAM algorithm based on particle filter [J]. Journal of Guangdong University of Technology, 2017, 34(2): 92-96.
ZHANG Y N, SUN F C, SHI X H. An improved RBPF-laser-SLAM algorithm [J]. Wireless Communication Technology, 2017, 26(4): 16-20.
CAI D Y, LIU Y A. Improved particle filter based on genetic algorithm [J]. Computer Simulation, 2018, 35(7): 221-225.
HUO F G, WANG S Q. Research on infrared small target tracking algorithm based on multi feature fusion [J]. Information Computer (Theoretical Edition), 2018(12): 56-59.
XIE H Y, LIU Y, HOU Q, et al . Prediction of PEMFC based on particle filter and genetic algorithm [J ] . Journal of Northeast Electric Power University, 2021, 41(1): 56-64.