您当前的位置:
首页 >
文章列表页 >
Risk identification and prevention in substation operation and maintenance using JHA-HAZOP methodology
更新时间:2026-07-01
    • Risk identification and prevention in substation operation and maintenance using JHA-HAZOP methodology

    • Vol. 59, Issue 6, Pages: 192-201(2026)
    • DOI:10.11930/j.issn.1004-9649.202510088    

      CLC:
    • Online First:22 June 2026,

      Published:2026

    移动端阅览

  • ZHANG Shaofan, NIU Zhenyong, OU Yanmin, et al. Risk identification and prevention in substation operation and maintenance using JHA-HAZOP methodology[J]. 2026, 59(6): 192-201. DOI: 10.11930/j.issn.1004-9649.202510088.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Collaborative optimization strategy for flexible distribution areas based on comprehensive control devices
Deep reinforcement learning-driven decision-making paradigm for electricity-carbon-hydrogen collaboration
The connotation, characteristics and construction ideas of the new rural energy system
Analysis on the spatiotemporal evolution mechanism of electricity consumption inequality in China
Multi-dimensional evaluation of renewable energy plant access strategy considering node centrality

Related Author

No data

Related Institution

No data
0