全清洁能源特高压青豫直流工程顺利投产初期,由于配套电源尚未全部投运,青海水电峰枯季节出力差异较大,新能源出力随机性、间歇性和波动性问题突出,仅依托青海难以满足直流大功率稳定输电要求。在深入分析青豫直流送端青海电网的负荷特性和发电特性的基础上,开展青豫直流外送电力平衡分析,针对存在的峰盈谷缺和汛富枯贫问题,提出发挥西北电网整体合力,实现西北多省份清洁能源打捆外送的模式,在新能源大发、新能源小发、黄河丰水期、黄河枯水期4种场景下开展模拟测算,结果表明,通过清洁能源打捆外送可有效提升特高压青豫直流稳定外送水平。
At present
the Qing (Qinghai)-Yu(Henan) UHV DC Project for all-clean energy transmission has been put into operation
but the supporting power sources have not been fully put into production yet. Due to the big output difference of hydropower between flood and dry seasons
and the stochastic
intermittent and fluctuating characteristics of wind and photovoltaic power output
it is hard to meet the requirements for large-power and stable transmission of Qing-Yu UHV DC Project by Qinghai Grid alone. Based on an investigation of the load and generation characteristics of the sending-end Qinghai Grid
a power balance analysis is carried out for the outbound transmission of the Qing-Yu DC Project. Aiming at the problems of surplus in peak time while shortage in valley time
and rich in flood season while poor in dry season for power output in the Qinghai Grid
the paper proposes a bundled clean energy transaction model for multiple provinces in the northwest region
so as to give a full play of the overall dispatching role of the Northwest Power Grid. Simulations are carried out under four scenarios
including the new energy enrichment and barren periods
the flood season and the dry season of the Yellow River. The results show that the bundled transaction of clean energy can significantly improve the stable outbound transmission level of the Qing-Yu UHV DC Project.
史连军, 韩放, 张国威. 华东、华中利用葛南直流系统开展电力市场交易可行性研究[J]. 中国电力, 2000, 33(11): 69–71.
SHI Lianjun, HAN Fang, ZHANG Guowei. Feasibility study on power market trading between east and central China using Ge-Nan HVDC transmission[J]. Electric Power, 2000, 33(11): 69–71.
史连军, 周琳, 庞博, 等.中国促进清洁能源消纳的市场机制设计思路[J]. 电力系统自动化, 2017, 41(24): 83–89.
SHI Lianjun, ZHOU Lin, PANG Bo, et al . Design ideas of electricity market mechanism to improve accommodation of clean energy in China[J ] . Automation of Electric Power Systems, 2017, 41(24): 83–89.
孙云涛, 宋依群. 基于调峰能力评估的省间调峰互济交易模式[J]. 电力系统保护与控制, 2018, 46(4): 86–91.
SUN Yuntao, SONG Yiqun. Peak load regulation trading mode for trans-provincial aid based on evaluation of system regulation capability[J]. Power System Protection and Control, 2018, 46(4): 86–91.
邹斌, 赵妍, 李晓刚, 等. 跨省跨区清洁能源消纳补偿的市场机制研究[J]. 电网技术, 2016, 40(2): 595–601.
ZOU Bin, ZHAO Yan, LI Xiaogang, et al . Market mechanism research on trans-provincial and trans-regional clean energy consumption and compensation[J ] . Power System Technology, 2016, 40(2): 595–601.
董存, 梁志峰, 礼晓飞, 等. 跨区特高压直流外送优化提升新能源消纳能力研究[J]. 中国电力, 2019, 52(4): 41–50.
DONG Cun, LIANG Zhifeng, LI Xiaofe i, et al . Study on power optimization of the trans-regional UHVDC delivery channels in promoting renewable energy accommodation capacity[J ] . Electric Power, 2019, 52(4): 41–50.
刘振亚, 张启平, 董存, 等. 通过特高压直流实现大型能源基地风、光、火电力大规模高效率安全外送研究[J]. 中国电机工程学报, 2014, 34(16): 2513–2522.
LIU Zhenya, ZHANG Qiping, DONG Cun, et al . Efficient and security transmission of wind, photovoltaic and thermal power of large-scale energy resource bases through UHVDC projects[J ] . Proceedings of the CSEE, 2014, 34(16): 2513–2522.
许丹, 王斌, 张加力, 等. 特高压直流外送风光火电力一体化调度计划模型[J]. 电力系统自动化, 2016, 40(6): 25–29, 57.
XU Dan, WANG Bin, ZHANG Jiali, et al . Integrated transmission scheduling model for wind-photovoltaic-thermal power by ultra-high voltage direct current system[J ] . Automation of Electric Power Systems, 2016, 40(6): 25–29, 57.
张粒子, 王睿, 金允剑, 等. 基于跨省发电权交易的“疆电外送”交易模式研究[J]. 电力系统保护与控制, 2012, 40(5): 69–74, 79.
ZHANG Lizi, WANG Rui, JIN Yunjian, et al . Study of transaction modes of Xinjiang electricity transmission based on trans-provincial generation right exchange theory[J ] . Power System Protection and Control, 2012, 40(5): 69–74, 79.
汪宁渤. 风电与火电打捆外送相关问题研究[J]. 中国能源, 2010, 32(6): 18–20.
WANG Ningbo. Study on wind power and thermal power transmission[J]. Energy of China, 2010, 32(6): 18–20.
郭小江, 马世英, 申洪, 等. 大规模风电直流外送方案与系统稳定控制策略[J]. 电力系统自动化, 2012, 36(15): 107–115.
GUO Xiaojiang, MA Shiying, SHEN Hong, et al . HVDC grid connection schemes and system stability control strategies for large-scale wind power[J ] . Automation of Electric Power Systems, 2012, 36(15): 107–115.
张银芽, 徐敏. 特高压送华中电网电能消纳与交易机制建设[J]. 中国电力企业管理, 2017(4): 44–47.
董梓童. 光热发电为何热不起来?[N]. 中国能源报, 2020-07-13(1).
程春田, 励刚, 程雄, 等. 大规模特高压直流水电消纳问题及应用实践[J]. 中国电机工程学报, 2015, 35(3): 549–560.
CHENG Chuntian, LI Gang, CHENG Xiong, et al . Large-scale ultra high voltage direct current hydropower absorption and its experiences[J ] . Proceedings of the CSEE, 2015, 35(3): 549–560.
辛建波, 王玉麟, 舒展, 等. 特高压交直流接入对江西电网暂态稳定的影响分析[J]. 电力系统保护与控制, 2019, 47(8): 71–79.
XIN Jianbo, WANG Yulin, SHU Zhan, et al . Transient stability impact analysis of UHV AC/DC access to Jiangxi power grid[J ] . Power System Protection and Control, 2019, 47(8): 71–79.
舒印彪, 张智刚, 郭剑波, 等. 新能源消纳关键因素分析及解决措施研究[J]. 中国电机工程学报, 2017, 37(1): 1–9.
SHU Yinbiao, ZHANG Zhigang, GUO Jianbo, et al . Study on key factors and solution of renewable energy accommodation[J ] . Proceedings of the CSEE, 2017, 37(1): 1–9.
龙霏, 王彤, 易杨, 等. 大规模风电接入的综合经济性评估[J]. 南方电网技术, 2019, 13(5): 72–76.
LONG Fei, WANG Tong, YI Yang, et al . Comprehensive economy evaluation with large-scale wind power integration[J ] . Southern Power System Technology, 2019, 13(5): 72–76.
杨冬锋, 周苏荃, 鲍锋. 风电并网系统低谷时段的调峰能力分析[J]. 电网技术, 2014, 38(6): 1446–1451.
YANG Dongfeng, ZHOU Suquan, BAO Feng. Analysis on peak load regulation capability of power grid integrated with wind farms in valley load period[J]. Power System Technology, 2014, 38(6): 1446–1451.
王超, 张红丽, 刘福锁, 等. 新能源集群送出交直流系统多稳定问题演化机理及防控措施[J]. 电力科学与技术学报, 2019, 34(4): 77–84.
WANG Chao, ZHANG Hongli, LIU Fusuo, et al . Evolution mechanism of multiple stability problems and control strategies of AC/DC power system with large-scale wind turbine generators[J ] . Journal of Electric Power Science and Technology, 2019, 34(4): 77–84.
付亦殊, 陈红坤, 姜欣, 等. 促进大规模风电消纳的双层调峰补偿机制研究[J]. 电力系统保护与控制, 2019, 47(4): 51–57.
FU Yishu, CHEN Hongkun, JIANG Xin, et al . A bi-layer peak-regulation compensation mechanism for large-scale wind power integration[J ] . Power System Protection and Control, 2019, 47(4): 51–57.
张宏宇, 印永华, 申洪, 等. 大规模风电接入后的系统调峰充裕性评估[J]. 中国电机工程学报, 2011, 31(22): 26–31.
ZHANG Hongyu, YIN Yonghua, SHEN Hong, et al . Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J ] . Proceedings of the CSEE, 2011, 31(22): 26–31.
孙勇, 魏敏, 王磊, 等. 基于系统调峰约束的电网风电消纳水平研究[J]. 电力系统保护与控制, 2019, 47(19): 107–112.
SUN Yong, WEI Min, WANG Lei, et al . Study on wind power consumption based on system peak regulation capability constrain[J ] . Power System Protection and Control, 2019, 47(19): 107–112.
姚金楠, 赵紫原. 10台机组9停运, 青海火电怎么了[N]. 中国能源报, 2019-08-12(1).
金维刚, 李勇, 印永华, 等. 特高压输电通道风火打捆配置方案及其概率灵敏度分析[J]. 电力系统自动化, 2016, 40(6): 126–133.
JIN Weigang, LI Yong, YIN Yonghua, et al . Optimum scheme and its probabilistic sensitivity analysis for wind power transmitted through UHV transmission corridors bundled with thermal power[J ] . Automation of Electric Power Systems, 2016, 40(6): 126–133.
谭忠富, 宋艺航, 张会娟, 等. 大规模风电与火电联合外送体系及其利润分配模型[J]. 电力系统自动化, 2013, 37(23): 63–70.
TAN Zhongfu, SONG Yihang, ZHANG Huijuan, et al . Joint delivery system of large-scale wind power and thermal power generation and its profit distribution model[J ] . Automation of Electric Power Systems, 2013, 37(23): 63–70.
毛峰, 桂前进, 王磊, 等. 风火打捆交直流外送系统区域间输电能力评估[J]. 中国电力, 2019, 52(1): 69-75.
MAO Feng, GUI Qianjin, WANG Lei, et al. Assessment on the total transfer capability of AC/DC system for integrated wind-thermal power[J]. Electric Power, 2019, 52(1): 69-75.
张澎, 党东升, 冯雪, 等. 风火打捆外送几个关键技术的研究进展[J]. 智能电网, 2016, 4(12): 1219-1224.
ZHANG Peng, DANG Dongsheng, FENG Xue, et al. Research progress of several key techniques for wind-thermal-bundled power transmission[J]. Smart Grid, 2016, 4(12): 1219-1224.
田军, 张师, 周毅博, 等. 风火打捆交直流混联系统暂态稳定控制策略研究[J]. 智能电网, 2016, 4(10): 1003-1006.
TIAN Jun, ZHANG Shi, ZHOU Yibo, et al. Control strategy for transient stability of wind-thermal-bundled AC-DC hybrid power system[J]. Smart Grid, 2016, 4(10): 1003-1006.
张恒, 袁铁江, 车勇, 等. 兼顾新能源穿透功率和风险的风光火打捆外送电源规划[J]. 电力系统自动化, 2018, 42(19): 71–76,32.
ZHANG Heng, YUAN Tiejiang, CHE Yong, et al . Power supply planning for wind-photovoltaic-thermal bundled transmission considering both power penetration and risk of new energy[J ] . Automation of Electric Power Systems, 2018, 42(19): 71–76,32.
卢孟林. 新能源富集地区电源远距离外送优化[D]. 武汉: 华中科技大学, 2019.
LU Menglin. New energy enrichment area power supply remote delivery optimization[D]. Wuhan: Huazhong University of Science and Technology, 2019.
郭晨, 王碧阳, 李立, 等. 特高压直流送端系统的运行约束及新能源消纳挑战研究[J]. 智慧电力, 2021, 49(5): 56–62.
GUO Chen, WANG Biyang, LI Li, et al . Power system operation constraint and new energy consumption challenge of UHV DC transmission system[J ] . Smart Power, 2021, 49(5): 56–62.
郭婉华. “风火打捆”外送系统的暂态稳定性研究[D]. 北京: 华北电力大学(北京), 2019.
GUO Wanhua. Transient stability analysis of wind-thermal bundled system[D]. Beijing: North China Electric Power University, 2019.
0
Views
0
下载量
6
CSCD
Publicity Resources
Related Articles
Related Author
Related Institution
京公网安备11010802024621