您当前的位置:
首页 >
文章列表页 >
Robust Co-planning of Water-Energy Nexus for Industrial Parks
Power System | 更新时间:2025-06-18
    • Robust Co-planning of Water-Energy Nexus for Industrial Parks

    • Electric Power   Vol. 54, Issue 7, Pages: 56-66(2021)
    • DOI:10.11930/j.issn.1004-9649.202006326    

      CLC:
    • Received:08 July 2020,

      Revised:2021-03-08,

      Published:05 July 2021

    移动端阅览

  • Zhisong LIU, Tao WANG, Yan FENG, et al. Robust Co-planning of Water-Energy Nexus for Industrial Parks[J]. Electric power, 2021, 54(7): 56-66. DOI: 10.11930/j.issn.1004-9649.202006326.

  •  
  •  

0

Views

0

下载量

2

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

An Electricity Market Trading Model for Distributed Resource Aggregators Considering Risk Management
Distributed Optimization for VPP and Distribution Network Operation Considering Uncertainty and Green Certificate Market
Optimization of Low-Carbon Technology Adoption Decision for Generation Enterprises Considering Cost Uncertainty
Multi-energy Optimal Scheduling of Industrial Parks Considering Green Certificate - Carbon Trading Mechanism and Hydrogen Compressed Natural Gas

Related Author

Zhe ZHAI
Ziyu CHEN
Qixing LIU
Yanjie LIANG
Zhiyong LI
Jinfeng WANG
Jinpeng LI
Yinliang XU

Related Institution

Dispatching and Control Center, China Southern Power Grid
Tsinghua Shenzhen International Graduate School
Guangdong Power Grid Co., Ltd. Maoming Power Supply Bureau
Guangdong Power Grid Co., Ltd. Electric Power Research Institute
School of Economics and Management, North China Electric Power University
0