Test Voltage Optimization and Safety Margin of Insulation Tools for Live Working of UHV AC Transmission Lines
Power System|更新时间:2025-06-18
|
Test Voltage Optimization and Safety Margin of Insulation Tools for Live Working of UHV AC Transmission Lines
Electric PowerVol. 54, Issue 7, Pages: 132-140(2021)
作者机构:
1.国网浙江省电力有限公司金华供电公司,浙江 金华 321000
2.中国电力科学研究院有限公司,湖北 武汉 430000
作者简介:
基金信息:
This work is supported by Science and Technology Project of SGCC (Development of UHV Special Safety Equipment and Research and Application of Key Technologies for Process Control and Testing of Electric Safety Equipment, No.SGSDDKOOKJJS1700077) and Science and Technology Project of State Grid Zhejiang Electric Power Co., Ltd. (Research and Application of Key Technology for Safety Maintenance of High Voltage Transmission Tower with Common Location of Mobile Base Station, No.5211JH18008A)
Kai ZHU, Yuqun FANG, Guangkai YU. Test Voltage Optimization and Safety Margin of Insulation Tools for Live Working of UHV AC Transmission Lines[J]. Electric power, 2021, 54(7): 132-140.
DOI:
Kai ZHU, Yuqun FANG, Guangkai YU. Test Voltage Optimization and Safety Margin of Insulation Tools for Live Working of UHV AC Transmission Lines[J]. Electric power, 2021, 54(7): 132-140. DOI: 10.11930/j.issn.1004-9649.202006146.
Test Voltage Optimization and Safety Margin of Insulation Tools for Live Working of UHV AC Transmission Lines
In view of the problem that the test voltage of live working insulation tools for 1 000 kV UHV AC transmission lines is too high
causing abnormal damage to the work tools
we made an in-depth analysis of the power frequency and operating overvoltage level for the live working condition of 1 000 kV AC transmission lines. And at the same time
a research was carried out on the voltage selection and safety margin for the 1 000 kV UHV live working insulation tool test. After comprehensive analysis
the reasonable test voltage and safety margin range are put forward
and the proposed revision values are verified by a number of tests including power frequency withstand voltage test
insulation material electrical performance test and live working safety test
which have fully proved the rationality of the proposed revision values.
关键词
Keywords
references
刘振亚. 中国特高压交流输电技术创新[J]. 电网技术, 2013, 37(3): 1–8.
LIU Zhenya. Innovation of UHVAC transmission technology in China[J]. Power System Technology, 2013, 37(3): 1–8.
HU Yi, LIU Kai, PENG Yong, et al . Research status and development trend of live working key technology[J ] . High Voltage Engineering, 2014, 40(7): 1921–1931.
HUO Feng, LU Wei, HUANG Daochun, et al . Study on electric field distribution characteristics of live-working and protection for crossing project of 1 000 kV-over-500 kV AC transmission lines[J ] . Power System Technology, 2019, 43(1): 349–355.
HU Yi, WANG Linong, LIU Kai, et al . On-site application test of live working of UHV AC transmission line[J ] . High Voltage Engineering, 2009, 35(9): 2053–2058.
ZHOU Chenmeng, LUO Richeng, WU Dong, et al . Analysis of equipotential operation mode of live working on small angle tower of ±800 kV transmission line[J ] . High Voltage Apparatus, 2019, 55(9): 179–186.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Live working-insulating ropes: GB/T 13035—2008[S]. Beijing: Standards Press of China, 2009.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Insulating hollow tubes and foam-filled tubes and solid rods for live working: GB 13398—2008[S]. Beijing: Standards Press of China, 2010.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Professional Health Standard of the People's Republic of China: Overvoltage and insulation coordination of 1 000 kV UHV AC transmission project: GB/Z 24842—2009[S]. Beijing: Standards Press of China, 2010.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Technical requirements and design guide for live working tools: GB/T 18037—2008[S]. Beijing: StandardsPress of China, 2009.
National Development and Reform Commission of the People's Republic of China. Guide of insulation co-ordination for live working: DL/T 876—2004[S]. Beijing: China Electric Power Press, 2004.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Insulation co-ordination—Part 2: Application guide: GB/T 311.2—2013[S]. Beijing: Standards Press of China, 2013.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Insulation co-ordination—Part 3: Procedures for high-voltage direct current(HVDC) converter stations: GB/T 311.3—2017[S]. Beijing: Standards Press of China, 2017.
Ministry of Housing and Urban-Rural Development of the People's Republic of China. Code for design of overvoltage protection and insulation coordination for AC electrical installations: GB/T 50064—2014[S]. Beijing: China Planning Press, 2014.
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China. Insulation co-ordination - Part 1: Definitions, principles and rules: GB 311.1—2012[S]. Beijing: Standards Press of China, 2013.
National Energy Bureau of the People's Republic of China. Technical guide for live working on 1 000 kV AC transmission line: DL/T 392—2015[S]. Beijing: China Electric Power Press, 2015.