您当前的位置:
首页 >
文章列表页 >
Incorporating typhoon track and precipitation forecasts for progressive dynamic control of reservoir stages during flood seasons
更新时间:2026-10-19
    • Incorporating typhoon track and precipitation forecasts for progressive dynamic control of reservoir stages during flood seasons

    • Journal of Hydroelectric Engineering   Vol. 45, Issue 9, (2026)
    • DOI:10.11660/slfdxb.20260901    

      CLC:
    • Online First:25 September 2026,

      Published:2026

    移动端阅览

  • 叶浩, 刘攀, 张晓菁, et al. Incorporating typhoon track and precipitation forecasts for progressive dynamic control of reservoir stages during flood seasons[J]. Journal of Hydroelectric Engineering, 2026, 45(9). DOI: 10.11660/slfdxb.20260901.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Review of forecast informed reservoir operation
Reservoir inflow forecasting for island areas based on multiple recurrent neural networks
Decision making for multi-objective reservoir operation schemes based on marginal substitution rate
Space-time effects of pipe cooling by dynamic control
Study on excavation and ventilation technology for Sanjen small-cross section hydraulic tunnels in high-altitude regions

Related Author

徐欢
于欣廷
陈浩
许月萍
郭玉雪
吴嘉杰
吴月秋
王丽萍

Related Institution

Hydro China Chengdu Engineering Corporation Limited
Nanjing Hydraulic Research Institute
Dam Safety Management Center of the Ministry of Water Resources
The State Key Laboratory of Hydrology-Water Resource and Hydraulic Engineering
School of Hydropower & Information Engineering, Huazhong University of Science and Technology
0