您当前的位置:
首页 >
文章列表页 >
Optimization of joint drawdown operation for cascade reservoirs in lower Jinsha River
更新时间:2026-01-21
    • Optimization of joint drawdown operation for cascade reservoirs in lower Jinsha River

    • Journal of Hydroelectric Engineering   Vol. 44, Issue 12, (2025)
    • DOI:10.11660/slfdxb.20251201    

      CLC:
    • Published Online:25 December 2025,

      Published:25 December 2025

    移动端阅览

  • 曹瑞, 李帅, 周曼, et al. Optimization of joint drawdown operation for cascade reservoirs in lower Jinsha River[J]. Journal of Hydroelectric Engineering, 2025, 44(12). DOI: 10.11660/slfdxb.20251201.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Extracting optimal operation rules for Yalong River cascade reservoirs
Benefit distribution method based on information entropy for optimal joint operation of cascade reservoirs

Related Author

向鑫
汪芸
钟斯睿
郭生练
谢雨祚
曾强
马顺刚
余春涛

Related Institution

Renewable Energy School, North China Electric Power University
Zhejiang Design Institute of Water Conservancy & Hydro-electric Power
State Key Laboratory of Hydrology,Water Resources and Hydraulic Engineering Nanjing Hydraulic Research Institute
Transport Planning and Research Institute,Ministry of Transport
China Institute of Water Resources and Hydropower Research
0