您当前的位置:
首页 >
文章列表页 >
Optimized reconstruction of 3-D point clouds of rockfill dam test pits with fast volume calculation method and its application
更新时间:2025-12-05
    • Optimized reconstruction of 3-D point clouds of rockfill dam test pits with fast volume calculation method and its application

    • Journal of Hydroelectric Engineering   Vol. 44, Issue 7, (2025)
    • DOI:10.11660/slfdxb.20250705    

      CLC:
    • Published Online:25 July 2025,

      Published:2025

    移动端阅览

  • 王建, 朱戎熙, 吴志刚, et al. Optimized reconstruction of 3-D point clouds of rockfill dam test pits with fast volume calculation method and its application[J]. Journal of Hydroelectric Engineering, 2025, 44(7). DOI: 10.11660/slfdxb.20250705.

  •  
  •  

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

MPM-DEM hierarchical multiscale method for macroscopic and microscopic analysis of deformation in rockfill dams
Numerical simulation of triaxial tests on gravelly soil based on DEM of irregular-shaped particles
Multi-objective parameter inversion of rockfill dams based on NSGA-Ⅱ algorithm
Study on parameter inversion of rockfill dams considering time series features and spatial distribution of monitoring data
Deformation prediction of rockfill dams based on time series decomposition and deep learning

Related Author

马刚
王頔
李易奥
周伟
安妮
王晓玲
余佳
刘明辉

Related Institution

State Key Laboratory of Water Resource and Hydropower Engineering Science, Wuhan University
Changjiang Institute of Survey,Planning, Design and Research
0