您当前的位置:
首页 >
文章列表页 >
Study on calculation methods of medium- and long-term multi-scale peaking shaving capacity of hydropower stations
更新时间:2026-07-22
    • Study on calculation methods of medium- and long-term multi-scale peaking shaving capacity of hydropower stations

    • Journal of Hydroelectric Engineering   Vol. 43, Issue 11, (2024)
    • DOI:10.11660/slfdxb.20241106    

      CLC:
    • Online First:25 November 2024,

      Published:2024

    移动端阅览

  • 艾学山, 黄馗, 石轩语, et al. Study on calculation methods of medium- and long-term multi-scale peaking shaving capacity of hydropower stations[J]. Journal of Hydroelectric Engineering, 2024, 43(11). DOI: 10.11660/slfdxb.20241106.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Intelligent deformation predicting methods for underground chambers of Longtan hydropower station
Intelligent earth-rock dams
Optimizing short-term operation of pumped storage stations considering power grid residual load forecasting
Precipitation nowcasting model based on spatiotemporal characteristics and error correction
Seismic response of earth-rock dams considering varying thickness of reservoir bottom sediment layers

Related Author

ZHANG Yan1
ZHU Zhende1
ZHU Shu1
ZHAO Changbing1

Related Institution

Research Institute of Geotechnical Engineering,Hohai University
Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University
State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology
0