您当前的位置:
首页 >
文章列表页 >
Research on simulation method of high arch dam construction process under cold conditions
更新时间:2026-07-22
    • Research on simulation method of high arch dam construction process under cold conditions

    • Journal of Hydroelectric Engineering   Vol. 43, Issue 10, (2024)
    • DOI:10.11660/slfdxb.20241008    

      CLC:
    • Online First:25 October 2024,

      Published:2024

    移动端阅览

  • 关涛, 肖一峰, 任炳昱, et al. Research on simulation method of high arch dam construction process under cold conditions[J]. Journal of Hydroelectric Engineering, 2024, 43(10). DOI: 10.11660/slfdxb.20241008.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Mobile augmented reality visualization of high arch dam construction simulations based on simultaneous localization and mapping optimization
EMD-P-ILSTM dynamic updating model for simulation parameters of high arch dam construction
Effects of reservoir water on simulations of arch dam dynamic characteristics
Influence of adverse structural planes on overall stability and abutment reinforcement
Time-space conflict analysis and adjustment methods for pouring concrete of high arch dams

Related Author

余佳
王佳俊
王栋
王晓玲
卢逊
乔雨
王国浩
肖尧

Related Institution

State Key Laboratory of Hydroscience and Hydraulic Engineering, Tsinghua University
Sichuan Airport Group Company Limited
Hubei Key Laboratory of Construction and Management in Hydropower Engineering, China Three Gorges University
College of Hydraulic & Environmental Engineering, China Three Gorges University
State Key Laboratory of Hydroscience and Engineering, Tsinghua University
0