您当前的位置:
首页 >
文章列表页 >
IT2FS-MARCOS method for risk assessment of water conservancy engineering construction
更新时间:2026-06-30
    • IT2FS-MARCOS method for risk assessment of water conservancy engineering construction

    • Journal of Hydroelectric Engineering   Vol. 43, Issue 7, (2024)
    • DOI:10.11660/slfdxb.20240710    

      CLC:
    • Online First:25 July 2024,

      Published:2024

    移动端阅览

  • 孙开畅, 薛文丽, 李婷婷, et al. IT2FS-MARCOS method for risk assessment of water conservancy engineering construction[J]. Journal of Hydroelectric Engineering, 2024, 43(7). DOI: 10.11660/slfdxb.20240710.

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Intelligent earth-rock dams
Acoustic fault diagnosis of hydraulic turbines based on fusion of convolutional attention and WGAN-AE
Seismic response of earth-rock dams considering varying thickness of reservoir bottom sediment layers
Precipitation nowcasting model based on spatiotemporal characteristics and error correction
Research on improved factor model and prediction method for dam deformation in pumped storage power stations

Related Author

No data

Related Institution

No data
0